Gradient

Portfolio

Take a Look at Some of the Projects NLB Climate Have Completed Over the Years!

Gradient
The Unit Gym Outdoors 2.jpg

Toshiba Gym Installation

Client: The Unit Gym, Banchory

Our Client Approached us Looking for a Solution for their Fitness Studio which got Hot and Humid During Fitness Classes. NLB Climate Carried out a Free Survey to Correctly Specify the Systems Needed for this Application. We Recommended Toshiba to our Client and After Agreeing Costs we Carried Out These Works at Nights so that our Client Still had use of their Fitness Studio. Systems Commissioned on Completion with Toshiba T7 Warranty.

Happy Client, Who are Over the Moon with the Works and the Systems. 

Gradient

Toshiba Server Room Installation

Client: Union Plaza, Aberdeen

NLB Climate were Approached by our Client to Design and Install Split Systems for their Server Rooms. We specified Toshiba for these works due to Pipe Run Lengths of up to 60m. We used Toshiba Super Digital Inverter Systems with Wall Mounted Indoor Units within the Server Rooms. Systems Commissioned on Completion and Received Toshiba T7 Warranty for the Clients Peace of Mind.

Union Plaza Comms Room Splits.jpg
Gradient
Safelift Install Indoors.jpeg

Fujitsu Showroom Installation

Client: Safelift Onshore, Aberdeenshire

Our client Approached NLB Climate looking for a Solution to cool and Heat their Newly Acquired Premises. We provided the Client with a specification and a Quote for the Supply, Installation and Commissioning of 5 Fujitsu Split Systems. With many challenges met during the Installation, NLB Climate Completed works on time and on budget with High Quality Workmanship. 

The client was very happy with what NLB Climate had completed for them that we later Installed a Fujitsu Wall Mounted Split system for their Server Room. 

Gradient

Mitsubishi Zen Sun Room Installation

Client: Josh, Ellon, Aberdeenshire

We were Approached by this Domestic client who wanted an Economical, Quiet and Aesthetically pleasing Solution for their Sun Room where the heat during Summer is unbearable. We recommended the Mitsubishi Zen, but with the shape and contruction of the room , we recommended 2 Systems for the Aesthetics of the room, which worked out very well and the Systems fit perfectly into the room. 

The client was over the moon with Mitsubishi Zen Systems and were very happy with the way NLB Climate carried out the works. Absolute pleasure to work for.

Sun Room 3.JPG
Gradient
Texo Blyth Outdoor.jpg

Mitsubishi Baggage Handling Module Installation

One of our many returning Clients asked us to carry out the Installation of 4 Mitsubishi Ducted Split Systems across 2 Temporary Baggage Handling Modules for a London Airport. This would provide Cooling and Heating in the area where the baggage X-Ray machines would scan luggage before boarding the aircrafts. 

These works were completed at the Port of Blyth in the North East of England as this is where the Modules had been fabricated and fitted out. 

Gradient

Mitsubishi Server Room Installation

Our Client approached us to Supply, Install and Commission a Mitsubishi Wall Mounted Split System in their Server Room. The Server Room was located in the Warehouse alongside the Toilet, Canteen and Electrical Cupboard which allowed us to run pipework on the roof of the rooms straight to outside where the A/C Compound was located. 

Nice and simple job and our Client happy again with the works we completed for them.

Texo%20Server%20Room%20Indoor%201_edited.jpg
Gradient
Outdoor%201_edited.jpg

Mitsubishi Inverter Compressor & Inverter PCB Repair

NLB Climate were contacted to carry out a Service/Repair call to a High Street shop Air Conditioning that was off on an error code. 

After carrying out all relevant fault finding on the system we found the Inverter Compressor and Inverter PCB at fault. 

We Quoted the repairs and when accepted we had the parts delivered within 1 Day to site. 

Carried out repairs to the system and got the system back up and running for our Client. 

Gradient

R22 Beermaster System Replacement

Client: Millennium Hotel, Glasgow

Our Client was having problems with one out two of there beer cellar systems located on their site. Both systems were running on R22. Due to current F-Gas Regulations, we had to replace the faulty system with an updated system from Beermaster. The client agreed to have both systems changed in the end. Both systems were sized correctly by NLB Climate. We decommissioned both of the R22 systems and removed from site to dispose of correctly. We then installed 2x Beermaster Systems for the client. These systems will provide the client with reliable operation and reduced running and maintenance costs. Overall, a very happy client.

Milennium Cellar Indoor 1.jpg

Social Media

  • Facebook
  • LinkedIn
  • Instagram

Registered Address:

3 Cormorant Brae,

Cove,

Aberdeen, AB12 3WH

 Scotland

Aberdeen - 01224 542150

Dundee - 01382 219058

Inverness - 01463 515081

Gradient

©2021 All Rights Reserved by NLB Climate Ltd.